Work Order
WO-1042
Complete all checklist items first

Emergency Valve Replacement

Engine Room · Assigned to Chief Engineer

In Progress Critical
Equipment E-007 Main Engine
Due 17 Mar 2026
Schedule Every 500 hrs · Running Hours
Description

Emergency isolation valve on port fuel line requires replacement. Temporary bypass installed — monitor for leaks every 2 hours. Part ETA 17 Mar.

Checklist 3/5
1.
Isolate fuel supply
Chief Engineer 14 Mar 10:30
2.
Install temporary bypass
Chief Engineer 14 Mar 16:15
3.
Order replacement valve (774-B)
1st Officer 15 Mar 10:15
4.
Replace valve and reconnect fuel line
5.
Pressure test at 2.5 bar for 30 min
Notes
Chief Engineer 16 Mar 14:32

Bypass valve installed. Monitoring pressure gauge every 2 hours. No leaks detected so far.

1st Officer 15 Mar 10:15

Part 774-B ordered via PO-89. ETA 17 Mar from supplier.